Mark of Excellence
homeaboutprojectsbidscareersnewsroomcontact
Roebbelen
1241 Hawks Flight Court El Dorado Hills, CA 95762    (916) 939-4000
photos



AC Transit Bus Facility
Oakland, CA

 

Sacramento County Fleet Maintenance Facility
Sacramento, CA





 

Industrial/Commercial
Whether you are building a warehouse, distribution center, airport or power plant, Roebbelen has the expertise and innovation to build your project on time and within budget. A member of the Roebbelen team acts as your representative from the start of the construction process allowing cost evaluations, materials and method selections to be incorporated into the process from the very beginning. This attention to detail reduces direct construction costs, minimizes change orders and keeps projects on schedule. Our innovation and attention to detail are a few of the many factors which sets us apart from our competitors. A few of our challenging industrial projects include:

Jones Fork Hydroelectric Power Plant: 
This project for the Sacramento Municipal Utility District (SMUD) required Roebbelen to tunnel a mile and a half underneath a mountain, then pop up in the middle of it, to install 8800 feet of 96 inch pipe. This five-story power plant was created mostly under the lake at the Union Valley site. Roebbelen brought a concrete batch plant on site and worked double shifts while the lake was down to complete the job.

Trident Missile Test Facility:
Located in China Lake in the desert just east of Bakersfield, this project required the company to inset a heavy movable metal structure into the rugged mountain terrain. The facility also needed to have a structured steel system, a concrete face that could withstand 1,000 degrees of heat and be embedded directly into the mountain top with anchors 30-40 feet deep.

 

Fresno Yosemite International Airport
Fresno, CA 


 

Jones Fork Hydroelectric Power Plant
Crystal Basin, Union Valley, CA

 
 
 

 

50th anniversary page