The project consisted of the renovation of an existing 55,000 SF warehouse located at McClellan Business Park, CA. This space houses all of the District’s support services. The project included demolition and abatement of the entire interior space and roof. New skylights were added to bring in more natural lighting into a space with no existing windows. All of the older lighting fixtures were retrofitted with more energy efficient lighting. The space also included an open gallery with mezzanine and elevator. Underground utilities were installed for three sets of new bathrooms and a break room. A large meeting room was constructed for district-wide meeting and events.

This project was completed utilizing the Design-Build delivery method. Roebbelen provided comprehensive preconstruction services. Our project manager led the entire team throughout the preconstruction effort to provide real-time constructability, material cost and schedule information and phasing analysis. Roebbelen also worked with the client and design team to determine which subcontractors and suppliers should be asked to bid. Upon receipt of all bids, we analyzed every aspect to determine our subcontracting team.

Name:
Twin Rivers Unified School District Office
Location:
McClellan, CA
Owner:
Twin Rivers District Office/span>
Architect:
Stafford King Wiese Architects
Awards:
Western Council of Construction Consumers – Distinguished Project Award