Pinole Valley High School

The existing Pinole Valley High School was demolished and students were housed on a temporary campus at the edge of the school site while the new campus was constructed. The new campus includes a three-story classroom/ laboratory buildings, performing arts, library/college and career center, gymnasium/locker/auxiliary gym building, cafeteria, central plant and outdoor amphitheater. This project also includes off site and roadway improvements to accommodate the new entrances and exits to the campus. The new high school is 267,000 sf and the houses 1,600 students.

Location:

Pinole, CA

Owner:

West Contra Costa Unified School District

Architect:

WLC Architects

Construction Manager:

Roebbelen Construction Management Services, Inc.